Performance Highlight

RLT PMM VS. IM in High GOR Well

Download as PDF
Adobe_Reader_PDF.png

RLT PMM VS. IM IN HIGH GOR WELL
 

Reynolds Permanent Magnet Motor Demonstrates Exceptional Reliability

 

Previously Installed IM

  • Severe load swings
  • Spiking motor temperatures
  • Multiple gas shutdowns in 3 days

375IM

high-gor-1.jpgClick on graph to enlarge

Pulled and Replaced with RLT 3.99” PMM

  • Stable operation despite large gas slugging
  • Small motor temperature fluctuations
  • Zero shutdowns in 3 days

RLT 3.99 PMM

high-gor-2-reynolds.jpgClick on graph to enlarge

hig-gor-inset.jpg


What Our Customers Are Saying

“Reynolds has been a valuable partner for our gas lift to ESP conversions. Their technical expertise, close attention to field service, quick response times, and ongoing well optimization have turned our project into a company-wide success story.”

— Tony Long, Production Engineer, PDC Energy

 

“Reynolds’ 3.99” OD motor is a great solution to have in our toolkit – specifically when needing 400+ HP in 5-1/2” casing applications.”

— Levi Harris, Production Manager, Colgate Energy